|
The latest Elecro EVO pool
heaters have evolved from the 800 Series.
These units come fully equipped and
pre-wired including a super sensitive flow switch, that allows safe coupling
to most pools.
They also come complete with a
control thermostat, safety thermostat and integral contactor relay.
The heaters are very easy to
install, requiring only final connection to a mandatory separate RCD.
No pump interterlock is required.
All heaters come fitted with 1½" BSP
female threaded adapters for easy connection to all pipe work.
All heaters are supplied with hose
tail adapters for connection to flexible pipework, and heater sizes 12-kW
through to 18-kW are also supplied with 1½" BSP unions for connection to rigid
pipe work.
Key Features
Technical
Specifications
|